«

»

Jul 29

Print this Post

Brew Sculpture Details

Let me kick off by saying that I don’t condone people building this brew stand themselves. The fabrication involves cutting, welding, plumbing gas, and some electrical work. If you don’t know how to do those things then I’m not going to be able to teach you through this website. If, on the other hand, you’re simply curious how I made my stand then you’re in luck.

I had numerous responses to my previous post taking me up on my offer to make my cutlist and SketchUp files available. Well here they are:

  • Cutlist – Microsoft Excel file with two worksheets covering the metal cutting list and the other parts I used.
  • SketchUp PlanGoogle Sketchup model of the sculpture I built. You can use this to drill in and get any measurement you are interested in.

By the way, I don’t claim this design is at all unique. I pulled from lots of freely available information on the internet and then made some adjustments for my own situation.

Hoppy Brewing,
Dave.

Permanent link to this article: http://www.slobrewer.com/homebrewing/brew_sculpture_details/

2 comments

1 ping

  1. Randy

    Dave I,m building the solbrewer sculpture for my son and I noticed a mistake in the cutlist that you may wish to correct. The HTL should be 18″ not 20″

    1. Dave

      Hi Randy,
      You are absolutely right. That should have read 18″ and it should be “HLT” (hot liquor tank) not “HTL”. Thanks for catching that. I’ve corrected and reuploaded the cutlist.

      Dave.

  1. SLO Brewer » Blog Archive » New Brew Sculpture

    […] I’ve got a cutlist and a Sketchup file of the sculpture. Contact me if you’d like copies. Updated: I’ve made a follow up post with these docs: http://www.slobrewer.com/2008/07/29/brew-sculpture-details/ […]

Comments have been disabled.